My 'Man Cave'
This web page under construction.
Man Cave objectives:
This is the existing structure.
The basement walls are clay tile. They are 7'-4" high. The ceiling is open 9" x 1 1/2" floor joists.
View showing screen and plaster.
Using a trowel I applied the plaster of paris onto the screen. The screen is tacked to the top of the door frame and then folded up